State Highway 392
If you utilize State Highway 392 from County Road 30 to CR32 in Weld County as away to commute to work, you may need to find an alternate route to work. Starting on July 28, 2008 DEI will be constructing a turn lane on the north side of the road at State Highway 392 and CR 31. The new turn lane work consists of grading of the shoulder, embankment, asphalt, striping, and storm line.

Ernie's Farewell
As of May 1st 2008 Ernest “Ernie” Duran retired from Duran Excavating, Inc., after more than 20 years of service. Everyone at DEI will miss him deeply, we all wish him the best in his travels to come.

Larimer County Landfill
You will be seeing DEI at the Larimer County Landfill for Phase 2 closure. The project consists of major earthwork to cover the landfill, with a couple minor storm lines. This will be a 90 calendar day project.

30 Years Of Service
Duran Excavating, Inc. will be celebrating 30 years in business this November. We would like to take this opportunity to thank everyone that has helped us along the way.

Town of Johnstown Storm Sewer

Duran Excavating, Inc. was awarded this project by the Town of Johnstown.
This project will be done in three phases, Phase I Approximately 799’ of 60” RCP, 1648’ of 48” RCP and 89’ of 18” RCP, bedding, construction staking, pavement removal and replacement, earthwork, concrete trickle channel, grading of existing ditch, reclamation and fabric reinforcing. The removal of an abandoned waterline, replacement of a culvert and construction of a baffles apron for an outlet into the Thompson River. Phase II. Approximately 717’ of 42” RCP, 58’ of 18” RCP bedding, construction staking, pavement removal and replacement and crossing through the railroad tracks at Charlotte Street. Phase III. Approximately 305’ of 42” RCP, 635’ of 36” RCP, 519’ of 24” RCP, and 190” of 18” RCP bedding construction staking, pavement removal and replacement, crossing through the Hillsboro Ditch, removal of headwall in the Hillsboro Ditch, and removal of two existing storm sewer manholes on Columbine Avenue.

Southwood Village Outfall

Duran Excavating, Inc. was awarded this project by the Southeast Metro Stormwater Authority This project is located in The City of Centennial. The description of work consists of installing approximately 3,600 linear feet of 18” thru 30” reinforced concrete pipe and appurtenant manholes and inlets. Install approximately 143 linear feet of 30” jacked concrete pipe. This work is located in existing roadways which will also include traffic control, asphalt replacement, concrete flatwork replacement and outfall boulders.

Reclaimed/Raw Water Interconnect Westminster

The City of Westminster awarded Duran Excavating, Inc. this project located in Westminster. The project provides for the construction of a pump station and 9,300 linear feet of reclaimed waterline ranging from 3” to 18” diameter and 600 linear feet of raw waterline 16” in diameter. The project also includes the construction of a 30’ long by 26’ wide by 14’ tall pump station building located at the City of Westminster’s Northwest Water Treatment Plant. The pump station design pumping capacity is 4,400 gpm. The pump station also includes a 20’ deep wet well for (2) 200 horse power vertical turbine pumps and motors. Due to the expansive clay soils the building foundation will be supported by drilled piers into bedrock. The pump station building will be constructed of CMU blocks with a brick veneer to match the architecture of the existing building on site. The project also includes the construction of approximately 2,583 linear feet of 18” diameter DIP reclaimed waterline; 610 linear feet of 16” diameter DIP raw waterline; 1,826 linear feet of 12” diameter reclaimed waterline, 478 linear feet of 8” diameter PVC reclaimed waterline; 333 linear feet of 4” diameter PVC reclaimed waterline; and realignment of approximately 155 linear feet of 8” potable waterline. This project also includes the construction of reclaimed waterlines using Horizontal Directional Drilling (HDD) which includes 2,710 linear feet of 10” reclaimed waterline along 120th Avenue 167 linear feet of 6” HDPE conduit with 4” HDPE slipline beneath Wadsworth Blvd ., 305 linear feet of 6” HDPE conduit with 3” HDPE slipline. Peripheral pipeline construction includes an open trench crossing Walnut Creek. Walnut Creek crossing includes 80 linear feet of 30” steel casing and 18” DIP carrier pipe and maintenance of storm flows and restoration of creek bed and banks. Peripheral pipeline also includes jack and bore of 184 linear feet of 22” steel casing and 10” PVC carrier pipe beneath the Bradburn Blvd., Bridge along 120th Avenue. Additional work includes dewatering, surface flow management, erosion & dust control, and traffic control.

Fairbairn Mead

Fairbairn Mead Fairbairn Mead Fairbairn Mead

 

Auburn Estates Conservation Development

Duran Excavating, Inc. was awarded this project by Victory West Development. The development is a conservation development of 64.39 acres into 26 lots. This project was started May 22, 2007. Auburn Estates is located in Fort Collins. The job consists of Residential Infrastructure, 26 Home sites grading, curbs. Asphalt, Sanitary, Water, Storm, County Road Improvements, overlay, and Storm.

Auburn Estates Conservation Development Auburn Estates Conservation Development Auburn Estates Conservation Development

 

Waterline Evans

Duran Excavating, Inc. was awarded this project by The City of Evans.
The project started May 28, 2007. The job consists of installation of approximately 5,947 linear feet of new 12-inch PVC water line, 388 linear feet of new 8-inch PVC water line and 10 linear feet of new 8-inch ductile iron water line. Installation of both 8” and 12” gate valves. Installation of approximately 12 new exterior water service meters. Installation of four Pressure Reducing Valve (PVR) stations.

top

Rocky Mountain Metropolitan Airport – Schedule I and Schedule II

The Rocky Mountain Metropolitan Airport is located at 11755 Airport Way in Broomfield Colorado. The Airport is between the cities of Denver and Boulder. As the General Contractor Duran Excavating, Inc. was awarded this project by CH2M Hill. This project consists of Relocation of Taxiway A, which consists of grading Safety Area Runway 11 L/29R. The project includes: Milling, Asphalt, Grading for taxiway, Cement treated sub grade, Geotextile fabric, Base course, Bituminous paving, Under drain, 48” Storm Sewer, Inlets, Electrical, and Seeding. Extreme measure had to be taken for safety and traffic control in order to keep the existing Airport in operation. This project had to be constructed in 4 different phases which required a very short construction schedule. Many overtime hours were required along with weekend work including Sunday.

Rocky Mountain Metropolitan Airport Rocky Mountain Metropolitan Airport Rocky Mountain Metropolitan Airport
Rocky Mountain Metropolitan Airport Rocky Mountain Metropolitan Airport  

top

Adams Avenue Mead

The Town of Mead is the owner of this project and awarded it to Duran Excavating Inc. as the General Contractor. The start date was August 13, 2007. The job consists of Road Improvements, Grading, Asphalt, Storm Sewer, Inlets, and Constructing a Pond.

Adams Avenue Mead Adams Avenue Mead Adams Avenue Mead

top

Nelson Road Improvements

The City of Longmont awarded Duran Excavating, Inc. this project as the General Contractor. This project started September 4, 2007. This project consists of Removal of asphalt pavement, Excavation, Embankment, Subgrade, prep Asphalt paving, Concrete flatwork, New storm sewer system 18”-42” RCP, Waterline installation, and Earthwork. The project is located along Nelson road which required difficult traffic control.

Nelson Road Improvements Nelson Road Improvements
top

Sanitary Sewer Improvements

As the General Contractor Duran Excavating, Inc. was awarded this project by the City of Greeley. This project will take place in two locations the 900 block of 12th and 13th. Avenue. Description of work consists of installing 8” PVC Sewer Main, Manholes, and Sewer Services. This work is located in existing roadways which also required Traffic Control and Asphalt Patching.

top

3rd Avenue & Gateway


3rd Avenue & GatewayOwner of this project is the City of Longmont Parks and Open Space Division. Duran Excavating Inc. is the General Contractor for this project. Description of work as follows: Erosion control, survey, demolition, site grading, drainage, crusher fine borders, concrete walks, irrigation, landscape, seeding, benches, and split rail fence.