Duran Excavating 2019 Projects

SH 52 ACCELERATION LANE TOWN OF FREDERICK

DEI was awarded the SH 52 Acceleration Lane project from The Town of Frederick. The work includes installation of storm sewer system including 129 lf. Of 12” HDPe pipe, 14 lf of CMP, 9 cy of rip rap, four type R inlets, relocation water meter and install concrete headwall.

WCR 74 - WCR 21 INTERSECTION IMPROVEMENTS TOWN OF SEVERANCE

DEI was awarded the WCR 74 & WCR 21 Intersection Improvements project from The Town of Severance. The work includes Roadway Widening 5000 SY of and Utility Infrastructure - includes removal of existing items, erosion control, grading 1500 CY of import, 300 Lf of 24” RCP storm sewer, subgrade preparation, pavement widening, traffic signal installation, signing and striping, and other miscellaneous items.

JAIL 2 WEST EXPANSION FOR ROCHE CONSTRUCTORS in Greeley

DEI was awarded the Jail 2 West Expansion project from Roche Construction. The project work consists of installing 266 l.f. of sanitary sewer service, 1 muffin monster, 216 l.f. of 4” water service, 216 l.f. of 8” fireline and 1,000 l.f. of PVC storm sewer line for the Weld County jail.

10TH STREET PHASE 2 GREELEY

DEI was awarded the 10th Street Phase 2 project from the City of Greeley. Detailed work includes completing access control improvements, installing 15,000 l.f. of curb, gutter and sidewalk and medians, landscaping, irrigation installation and street lighting.

37TH STREET UTILITY for THE CITY OF EVANS

DEI was awarded the 37th St. Utility Improvements project from the City of Evans. Detailed work includes installation of approximately 2,900 lf of sanitary sewer line, 5,000 lf of 12” waterline, 400 lf of 48” RCP storm sewer and replace 6.613 s.y of asphalt. Work also includes erosion control, traffic control and concrete work and asphalt paving & patching.

LA PLATA PEAK GENERAL STORM SEWER in City & County of Denver

DEI was awarded the La Plata Peak General Storm project from the City and County of Denver. The La Plata Peak General Storm contract has two separate project locations, one at 43rd Ave & Sherman St and the other at Exposition Ave & S Fillmore St. Each location will address localized flooding problems by constructing a new storm drain system that ties into existing storm drain infrastructure. Concrete flatwork such as curb, gutter, sidewalk and concrete crosspans and asphalt paving will also be part of the scope of work. Detailed work includes installation of 60 lf of 15”, 155 lf of 18”, 190 lf of 24”, and 470 lf of 30” RCP storm sewer, 6 inlets and 10,000 sy of asphalt replacement, 850 lf of curb & gutter on 43rd Ave. Installation of 430 lf of 18”, 850 lf of 24”, 3,456 lf of 30” and 1,150 lf of 56” RCP storm sewer, 26 manholes, 24 inlets, 45,000 sy of asphalt replacement, 1,375 sf of concrete sidewalk and 2,150 ft of concrete crosspan on Exposition Ave.

LIVERPOOL ST. 24" WATER LINE PHASE 2C IN CENTENNIAL

DEI was awarded the Liverpool St. 24” Waterline project from the East Cherry Creek Valley Water & Sanitation District. This project consists of Installation of 3,870 l.f. of 24”, 269 l.f. of 12” and 20 l.f. of 6” PVC waterline, four 24” and one 16” butterfly valves with vaults, 5 gate valves, wet taps, hydrants, tie into existing waterline, mill and replace asphalt, and traffic control.

ER R400-329 ON US 287 & SH 14 N. OF FORT COLLINS for CDOT

DEI was awarded the US 287 /SH 14 Flood Repairs project from the Colorado Department of Transportation. This project consists of Flood Repairs from the 2013 floods on SH 14. Detailed work includes removing 1,561 s.y. of pink rip rap up highway 14, installing 1,564 tons of 9” special rip rap, installing 140 l.f. of 36” RCP storm pipe with headwalls, 179 l.f. of reinforced RCP pipe, removal of 305 l.f. of type 3 guardrail, installation of approximately 3,200 c.y. of embankment material, installing of 1,200 c.y. of class A filter material, diverting the Cache La Poudre river 600 foot and dewatering and installing 1,200 c.y of rip rap.

CLEAR CREEK CROSSING PHASE 2 in Wheat Ridge for Longs Peak Metro District under Ma Mortenson

DEI was awarded the Clear Creek Crossing Phase 2 Utilities project from MA Mortenson. This project consists of installation of approximately3,886 l.f. of 18" - 72" RCP storm sewer, 5'x12' box culvert, manholes & inlets, outlet structures & headwalls, installation of 1,154 l.f. of 15"-18" sanitary sewer pipe and manholes. This project also includes dewatering, traffic control, installation of 574 c.y. of riprap and 615 grouted boulders.